News
Why Facilities Management Should Be Involved From the Start Of A Project
Project success often comes down to hitting timelines, staying within budget, and keeping everyone happy. But one crucial piece, facilities management (FM), often gets brought in too late, even though it directly affects all three. When project managers see their FM colleagues as just operational support instead of strategic partners, they miss a big chance to make their projects less risky and get better results. Bringing facilities management into the process right from the start means the final product won’t just be delivered on time, but will also be functional, safe, and sustainable throughout its entire life.
FM as a Strategic Project Partner
Traditionally, facilities management teams only get involved near the end of a project. Their job is to take over and maintain a new or refurbished space. This late handover often causes problems, because decisions made during design and construction can have long-term operational consequences. A truly strategic approach means getting FM professionals involved during the project’s initial planning stages.
Their early input offers invaluable insights into how things will work long-term. For example, an FM team can advise on where to put essential building services, how durable materials need to be, and how accessible equipment should be for future maintenance. This proactive advice helps avoid expensive redesigns and ensures the finished asset is efficient to run. Understanding what facility management means – bringing together people, place, process, and technology – is the first step to seeing its strategic value beyond just simple maintenance.
Supporting Site Operations
During the delivery phase of any project, especially those involving physical sites like construction or office fit-outs, keeping the site itself running smoothly is essential. This is where facilities management provides crucial logistical and operational support that keeps the project on track, complementing vital soft skills in project management. The role of FM departments goes far beyond the finished building; it includes managing the temporary project environment.
This support covers many activities:
-
Coordinating site access for various contractors and delivery vehicles.
-
Managing temporary utilities like power, water, and data connectivity.
-
Making sure welfare facilities for site personnel are clean, stocked, and working.
-
Setting up security protocols to protect assets and materials on site.
Without this organised operational backbone, project sites can quickly become chaotic, leading to delays, lost materials, and lower productivity. An effective FM team acts as the operational engine, letting the project team focus on their main delivery tasks.
Ensuring Health and Safety Standards
A project manager’s responsibility for health and safety is non-negotiable, and facilities management is a key partner in upholding these standards. FM teams are experts in building compliance and workplace safety regulations. Their knowledge is vital for maintaining a safe project environment from start to finish, covering everything from ensuring fire safety systems work to managing slip and trip hazards.
Waste management is a crucial, and often complex, part of site safety. Project sites generate various waste streams, some of which might be hazardous or need special handling. For refurbishment or healthcare projects, this can include managing specialist waste streams such as offensive waste, which may require a dedicated hygiene waste collection service to support safe handling, collection, and disposal. Failing to manage waste correctly can lead to regulatory fines, project delays, and significant health risks for workers and the public.
Impact on Project Timelines and Budget
Every decision a facilities manager makes directly or indirectly impacts a project’s two most critical constraints: time and money. By bringing in FM expertise early, project managers can create more realistic budgets and schedules that consider long-term operational costs and maintenance needs. This foresight helps prevent unexpected expenses after handover.
For instance, choosing a cheaper but less durable flooring material might save money initially, but if it needs replacing twice as often, the total cost of ownership will skyrocket. An FM professional can provide that lifecycle cost analysis. Proactive maintenance, managed by an FM team during the project, also prevents costly downtime. An unexpected power failure or plumbing issue on a busy site can halt work for hours or even days, causing significant delays and budget overruns. Proper facilities management reduces these risks, ensuring the project moves forward smoothly and predictably.
Ultimately, seeing facilities management as an essential part of the project team leads to better-built environments and more successful project outcomes. Their contribution goes far beyond cleaning and repairs; it’s a strategic function that protects the asset’s value and ensures it meets user needs for years to come.